Aerial view of a hospital complex in Lower Silesia

    Hospital, Lower Silesia

    Healthcare · Lower Silesia, Poland

    A hospital cannot switch its heating off while it is modernised. We prepared a retrofit planned around a building that never closes.

    Location
    Lower Silesia, Poland
    Sector
    Healthcare
    Scope
    • Functional and utility programme (PFU)
    • Retrofit design

    The brief

    The hospital needed to modernise the heating and energy system of its complex and to procure the work as a public contract. That calls for a functional and utility programme (PFU): the document that defines what the new system must achieve and becomes the basis of a design-and-build tender.

    What we did

    We assessed the existing installations and the hospital's demand for heat and power, then wrote the PFU and prepared the retrofit design. The design puts reliability of supply first and running cost a close second.

    The outcome

    The hospital has a tender-ready PFU and a retrofit design to build the investment on.