ESA Trucks DAF service centre in Iłowa

    ESA Trucks, Iłowa

    Industrial · Iłowa, Poland

    The site had solar panels and a hybrid heating system, but neither was working for the business. We made them work together and cut operating cost by 65%.

    Client
    ESA Trucks
    Location
    Iłowa, Poland
    Sector
    Industrial
    Floor area
    5,000 m²
    Timeline
    4 months
    Scope
    • Energy audit
    • Heat pump optimisation
    • Energy management

    The brief

    Although the building had a working solar installation, its output did not match the site's operating hours and energy needs. The hybrid heating system was inefficient and poorly controlled, and the site was paying charges for excess gas use.

    What we did

    Our engineers metered the site section by section and studied how it used energy over three months. We retuned the heat pumps, heating and ventilation, set automatic limits on gas and power use, and keep the site under daily watch. The analysis also made the case for a 200 kWh battery, which now lets the site rely less on the grid.

    The outcome

    Operating cost fell by around 65%. Charges for excess gas use have almost disappeared, solar generation now lines up with demand, and the investment paid back in 10 months.

    Results

    • 65%Lower operating cost
    • 10 monthsPayback
    • €60kAnnual savings