Still tendering retrofits without an engineer on your side?
Before the tender, our engineers check your buildings, find where the money goes and write the requirements, so the contractor delivers the savings.
A tender decides what your buildings cost to run for decades. Without an engineer on your side, the cheapest bid wins, not the cheapest building to run.
What goes wrong without an engineer
Where public money leaks
01
Money goes to the wrong building
Investment follows the loudest complaint, not the biggest saving.
02
Systems bigger than needed
A vague tender buys capacity the building doesn't need.
03
Defects nobody checks
Badly set systems can use several times the energy they should.
04
Grants without hard data
Funding needs an audit and numbers you can defend.
What we do
From first check to handover

Technical review before a retrofit: school, Lower Silesia 01
We check your buildings
Our engineers check the buildings and the bills. You get a ranking of what to fix first and when it pays back.

PFU and retrofit design: heritage building, Lower Silesia 02
We write the tender requirements
A PFU with requirements the contractor must meet, so the savings end up in the contract.
03
We check the handover
We measure the results after the works and catch errors before the warranty ends.

Example: Środa Śląska
A new school used five times the energy it should
- ~80%Lower energy and heating bills
- €160kAnnual savings
- 3 weeksFrom first visit to final report

Smart metering projects
Your buildings, measured every day
After the works we measure every building and alert you to leaks and failures straight away.
15–25%lower running costs, typically
Questions from municipalities
Good to know
Will you help us get a grant?
Yes. We prepare the energy audits and savings calculations that funding programmes require.
Can you write the PFU for our tender?
Yes, with measurable requirements, so every bid covers the same scope and the savings are in the contract.
What does it cost and how long does it take?
It depends on the number of buildings; we quote after a free call. A 4,900 m² school took three weeks from first visit to report.
Before your next tender, bring in an engineer