Meterd - energy efficiency
    ESA Trucks Poznań
    Automotive
    Meterd System
    Advisory

    ESA Trucks Poznań

    We advised and implemented a hybrid heating system with an optimized heat pump cascade complemented with already existing gas boiler. Smart metering allows predictive maintenance and seasonal adjustments.

    Timeline: 6 months
    Building Size: 5,000 m²
    60%
    Utility Usage Reduction
    Lower energy, gas and water usage with a smaller carbon footprint
    120
    On-site Personnel
    Reporting noticeably better thermal comfort and IAQ
    €65k
    Annual Savings
    Combined energy and gas heating cost reduction
    24/7
    Real-time Monitoring
    Continuous visibility across all facilities
    The Challenge

    The Challenge

    The Poznań location of ESA Trucks struggled with high reactive power fees and a major mismatch between solar energy production capacity and the day-to-day energy needs for industrial processes. This resulted in high utility costs despite extensive usage of renewable energy solutions.

    The Solution

    The Solution

    We implemented the Meterd System for comprehensive energy monitoring across three main facilities, combined with our Virtual Energy Manager for optimizing energy consumption during peak and off-peak hours. Real-time dashboards provided instant visibility into energy patterns and anomalies.

    Products used:
    Meterd System
    Advisory
    The Results

    The Results

    The combination of better energy management, solar production alignment and HVAC optimization provided drastic efficiency improvements. The facility is now easier to monitor and manage, while increasing workplace thermal comfort and maximixing local energy production with a lower grid dependency.

    Similar Success Stories

    See how other organizations achieved results

    ESA Trucks Iłowa
    Automotive

    ESA Trucks Iłowa

    We optimized the functioning of the heating pump installation and implemented a dedicated energy & gas guardian system. Our analysis resulted in a new investment into a 200 kWh energy storage unit, which radically reduced grid dependency.

    65%
    Operational cost reduction
    10mo
    Return on system investment
    Meterd System
    Advisory
    View Case Study
    Public School in Środa Śląska
    Municipal

    Public School in Środa Śląska

    Comprehensive efficiency audit uncovered critical technical errors from the building phase, which caused excessive utility usage. Our advisory provided a clear optimization path.

    €160k
    Realized annual savings in energy and heating costs
    3 weeks
    From on-site auditing to a ready report
    Advisory
    View Case Study

    Want similar results?

    Let's discuss your energy efficiency goals