    We optimized the functioning of the heating pump installation and implemented a dedicated energy & gas guardian system. Our analysis resulted in a new investment into a 200 kWh energy storage unit, which radically reduced grid dependency.

    Timeline: 4 months
    Building Size: 5,000 m²
    65%
    Operational Cost Reduction
    Savings in energy and heating efficiency
    10 mths
    Return On Investment
    Quick efficiency gains achieved with the Meterd system
    €60k
    Realized Annual Savings
    Higher efficiency and mitigating reactive power gas fees
    99.9%
    System Uptime
    Reliable monitoring with predictive maintenance
    The Challenge

    The Challenge

    Although the building had a functioning PV installation, its generation capacity was mismatched with the facility's operational schedule and energy needs. In addition, the implemented hybrid heating solution was inefficient and mismanaged.

    The Solution

    The Solution

    We deployed the Meterd System with specialized configurations for the industrial processes schedules and categorization of facility sections. Our Advisory team analyzed the building's usage patterns over 3 months, helped optimize HVAC systems and implemented a gas guardian feature to mitigate excessive usage.

    Products used:
    Meterd System
    Advisory
    The Results

    The Results

    After implementing our Meterd monitoring system with the Gas Guardian feature, the facility utility usage dropped by around 65%. We were able to mitigate almost all of the reactive power fees for excessive gas usage, while improving the alignment between solar power generation and energy usage patterns.

    Similar Success Stories

    See how other organizations achieved results

    ESA Trucks Poznań
    Automotive

    ESA Trucks Poznań

    We advised and implemented a hybrid heating system with an optimized heat pump cascade complemented with already existing gas boiler. Smart metering allows predictive maintenance and seasonal adjustments.

    60%
    Reduction in annual utility bills
    24/7
    Energy usage & production monitoring
    Meterd System
    Advisory
    View Case Study
    Public School in Środa Śląska
    Municipal

    Public School in Środa Śląska

    Comprehensive efficiency audit uncovered critical technical errors from the building phase, which caused excessive utility usage. Our advisory provided a clear optimization path.

    €160k
    Realized annual savings in energy and heating costs
    3 weeks
    From on-site auditing to a ready report
    Advisory
    View Case Study

    Want similar results?

    Let's discuss your energy efficiency goals